Flagler Feasibility Study

Flagler Feasibility Study

FDOT District VI feasibility study to evaluate an elevated transit alignment along SR 968/Flagler Street from Downtown Miami to Florida International University (FIU).
CMPLX Role: Utility Assessments/Coordination, Constructability & Impact Reviews, and Alternative(s) Evaluations/Reviews

No items found.

MDCR Master Plan Replacement Jail

MDCR Master Plan Replacement Jail

MDCR Design-Build services for Site 1 (Training & Treatment Center) of the Master Plan Replacement Jail at the TGK Correctional Facility campus.
CMPLX Role: Design Coordination, Constructability Reviews, and Permitting Support

No items found.

Golden Glades Interchange (GGI)

Golden Glades Interchange (GGI)

FDOT District VI Golden Glades Interchange (GGI) reconstruction project - SR 9A/I-95 from NW 135th Street to the Biscayne Canal.
CMPLX Role: Value Engineering (Roadway, Drainage, Signing & Pavement Markings) and Alternative Temporary Traffic Control Plans

No items found.

Chesapeake Bay Parallel Thimble Shoal Tunnel

Chesapeake Bay Parallel Thimble Shoal Tunnel

Chesapeake Bay Bridge and Tunnel District parallel thimble shoal tunnel project to the Lucius J. Kellam, Jr. Bridge - Tunnel.
CMPLX Role: Value Engineering and Alternative Concept(s) Development for Trestle A/B Alignments

No items found.

Hobie Island North Side Shoreline

Hobie Island North Side Shoreline

MDC PROS Hobie Island North Side Shoreline Roadway Protection project of Rickenbacker Causeway.
CMPLX Role: Temporary Traffic Control

No items found.

SR 736/Davie Boulevard Bascule Bridge Rehabilitation

SR 736/Davie Boulevard Bascule Bridge Rehabilitation

FDOT District IV movable bridge rehabilitation project for the SR 736/Davie Boulevard Bascule Bridge over the South Fork New River [Bridge No. 860038].
CMPLX Role: Roadway, Temporary Traffic Control, and Signing & Pavement Markings

No items found.

Metro 2 at Edgewater

Metro 2 at Edgewater

Private development project for the construction of a 28-story mixed-use building and roadway improvements along NE 30th Terrace, NE 4th Avenue, and NE 31st Street.
CMPLX Role: Civil Engineer of Record

No items found.

Wynwood One

Wynwood One

Private development project for the construction of a 6-story mixed-use building.
CMPLX Role: Civil Engineer of Record

No items found.

200 North Federal

200 North Federal

Private development project for the construction of a 7-story mixed-use building.
CMPLX Role: Civil Engineer of Record

No items found.

CR-713/SW High Meadow Avenue

CR-713/SW High Meadow Avenue

FDOT District IV Project Development and Environmental (PD&E) Study for the four-laning of CR-713/High Meadows Avenue from SR 9/I-95 to CR-714/Martin Highway.
CMPLX Role: Drainage, Signing & Pavement Markings, Lighting, and Signalization

No items found.

South Corridor BRT

South Corridor BRT

MDC DTPW Design-Build to implement Bus Rapid Transit (BRT) along the 20-mile South Corridor (South Dade Transitway).
CMPLX Role: Design Coordination and Constructability Reviews

No items found.

Toledo Blade Boulevard

Toledo Blade Boulevard

Public-Private Partnership for the reconstruction/widening of Toledo Blade Boulevard from Tamiami Trail (SR 45/US-41) to El Jobean Road (SR 776).
CMPLX Role: Roadway Design Support and Drainage

No items found.

2140 S. Dixie Highway
Suite 308
Miami, FL 33133